2011 Commercial

As part of the transformation and renovation of Neopharm building in Petah Tikva, a twenty two-meter steel bridge was designed to connect older building with the new Neopharm headquarter.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

As part of the transformation and renovation of Neopharm building in Petah Tikva, a twenty two-meter steel bridge was designed to connect an older building with the new Neopharm headquarter. The bridge was also planned by the architects (Shilo is a qualified engineer) and the constructor, designed as an asymmetrical steel structure according to the specifics of the site, including a single steel truss on one side of the bridge (usually there are two trusses on both sides), enabling a full panoramic view over the industrial zone.

 

 

Project credits:

 

Langth: 22 meter

Architecture: Shilo Ben Aroya Architects

Commissioner: Neopharm Ltd.

Location: Petah Tikva, Israel

Structural Engineers: Vera Neustain

Metal Work: adi 2000

Photographer: Friederike Von Rauch

 

 

Related Projects: